What a fantastic week. We are lucky to have been provided amazing space at the Generator in Reno for pre-playa construction of The Life Cube. The team came and built, and built, and built. Lumber was delivered last week, by Saturday, we had used almost all we had, and ran to get more on Saturday, and more on Sunday! The walls are framed, the pillars are built, panels for the Tapestry Wall are coming in every day. Huge thanks to fellow artists that offered a hand, to the folks in Reno who came and helped, and showered us with love. Thanks to the Matt and Andy for letting us take over so much space. I am awed by the support and help.